How to prepare your home for air conditioning installation day

What to clear, move and plan before air conditioning installation day, how long it takes, what the weather changes and who cleans up, with a preparation sheet.

Last updated

Clear the way to where each unit will go, to the switchboard and, for a ducted system, to the roof space. Move anything fragile, plan for the power to be off for part of the day, keep pets and children away from the work, and be home at the start and at the end. We allow four to six hours for a standard home split system. The preparation sheet on this page covers the rest.

How to use this guide

  1. Step 1: Get the house ready

    What to clear, move and plan for, area by area.

    Go to Before the day
  2. Step 2: Fill in the preparation sheet

    Access, pets, power and who does what at the end.

    Go to the record
  3. Step 3: Ask us about your day

    How long we expect your job to take, and when we will arrive.

    Call (03) 5153 2650

What should I do before the installers arrive?

Getting the house ready for installation day
WhereWhat to doWhy
The wall for the indoor unitMove furniture, pictures, shelves and electronics away from the wall and from under it. Cover what cannot be moved.The installers work on ladders at that wall, and drilling through it makes dust.
The spot for the outdoor unitClear bins, pots, stored things and overgrown plants. Unlock side gates.The unit, its base and the pipes all have to be carried in and fitted there.
The switchboardClear the way to it and unlock the meter box if it has a lock.The electrician works there, and the power is switched off from there.
The roof spaceFor a ducted system, or pipes that run through the ceiling: clear the floor under the access hole, and move stored things in the roof away from the work.The indoor unit, the ducts and the installers all go through that opening.
The drivewayLeave room close to the house for a van, and say if parking is tight or shared.Units and materials are heavy, and tools go back and forth all day.
Pets and childrenKeep them in another part of the house or off the property for the day.Doors and gates stand open, and there are ladders, tools and open holes about.

If the house was built or renovated before 1990, tell the installer before the day and not on it. Asbestos in Victoria (opens in a new tab) says a home of that age is likely to contain asbestos, and WorkSafe Victoria (opens in a new tab) says a tradesperson must identify asbestos that is likely to be disturbed before starting work. A wall that has to be checked first can move the date. See the guide to installation and asbestos.

Will the power be off?

For part of the day, yes. The electrician turns the power off to connect the new circuit at the switchboard. Where anyone has to work in the roof space, the power to the house goes off for that too: WorkSafe Victoria (opens in a new tab) tells tradespeople to turn off the main switch before they enter a ceiling space, because so much household wiring runs through it.

  • Ask the installer roughly when the power will be off, and for how long.
  • Charge phones and laptops beforehand, and save your work if you work from home.
  • If anyone in the house relies on powered medical equipment, say so when you book, so the day can be planned around it.
  • Expect clocks, the internet modem and an alarm system to need attention afterwards.

Do I need to be home?

Someone who can make decisions should be there at two points. At the start, we confirm with you exactly where each unit goes, where the pipes run and where the drain ends, before anything is drilled. At the end, we run the system, show you how to use it and hand over the paperwork. In between, the installers need access but not company.

The guide to commissioning and handover has a checklist for that last part of the day.

How long does an installation take?

ABL allows four to six hours for a standard home split system and one to three days for a ducted system, depending on the size of the house and how involved the job is. Those are guides for straightforward jobs. Yours may be shorter or longer, because of:

What changes how long an installation takes
What changes the timeWhy
How many unitsEach indoor unit is its own wall, its own pipe run and its own drain. Several systems, or a multi-split, can run over a few days.
Where the units goUnits far apart, on different levels or on an inside wall mean longer runs of pipe, cable and drain to fix and cover.
AccessA tight side path, a low roof space or work on a second storey slows every step, and safe access at height has to be set up first.
Electrical workA new circuit is part of the day. Work on the switchboard can be a separate visit, and some of it has to be inspected before it is turned on.
An old systemTaking out an old unit, recovering its refrigerant and removing its pipes comes before the new one goes in.
What the wall or roof turns upFraming in the way, old wiring or a material that has to be checked can stop work until it is dealt with.
WeatherRain, wind and heat can stop the parts of a job that are outside, at height or in the roof.

Ask for the estimate for your own job, and what it assumes. Ask too how a change to the price or the timing will be handled if something comes up during the job.

What happens if the weather is bad?

It depends on which part of the job the weather touches, and the call is the installer's to make on the day. A split system that is all at ground level, with the indoor work under cover, often goes ahead in light rain. Work at height and work in a roof space are another matter:

  • On a roof, a ladder or a lift. WorkSafe Victoria (opens in a new tab) lists rain, strong or gusty winds and extreme heat or cold among the conditions that raise the risk of a fall, along with any surface that is wet and slippery. It says work at height should be kept to a minimum in extremely hot or cold weather.
  • In a roof space in summer. A roof space is a hot place to work. WorkSafe Victoria (opens in a new tab) advises rescheduling hot tasks to the cooler part of the day, so roof work may start early or move to another day. There is no set temperature at which work has to stop, so ask the installer what their own rule is.

Ask beforehand how you will be told if the day is called off, how soon the job would be rebooked, and how a job that has been started is left: weatherproof, safe and with the power back on.

What disruption should I expect?

  • Noise. Drilling through a wall is loud for a short time. Tell a neighbour who shares the wall or works nights.
  • Dust. Mostly at the wall for the indoor unit, and under each ceiling opening for a ducted system.
  • Open doors. People carry things in and out all day, so the house will not hold its heat or its cool.
  • Rooms out of use. The room being worked in, the path to it, and for a ducted system each room while its outlet is cut in.
  • No power for part of the day.
  • People in the roof, for a ducted system, for most of the job.

Who cleans up and makes good when the job is finished?

Agree it before the day, because it is where expectations most often differ. Sealing the hole the pipes pass through is part of the installation, and we clean the work area when we finish. Taking an old system away, patching plaster and painting vary from job to job, so a quote should say whether each is included.

What to agree before installation day
To agreeAsk
Packaging and rubbishDoes the installer take all of it away?
An old systemWho removes it and takes it away? See the guide to removing an old air conditioner.
Old holes, brackets and marksAre they patched, and is the patch painted? By whom?
New ceiling openings, for a ducted systemWho finishes around each outlet and the return air grille?
Pipe covers and finishSee the guide to standard and non-standard installation for what to agree.
Anything unfinishedHow is it recorded, and when will it be done?

Put it in writing. Consumer Affairs Victoria's checklist for small jobs (opens in a new tab) says to have a written contract for all work, even small jobs, that clearly specifies the work to be done and the total cost, and to put any agreed changes in writing.

Installation day preparation sheet

Fill this in a few days ahead. The first parts are for you. The last part is what to agree with the installer, so that nothing is left to the day.

Installation day preparation sheet

Copy or print the finished sheet, and send the access and household details to your installer.

Your answers stay on this open page. They are not saved or sent. Copy or print them before you leave.

The day

Access

Way to the switchboard is clear
Way to the roof space is clear, if needed

Inside the house

Furniture and fragile things moved from the indoor unit wall
Things that cannot be moved are covered

Power

If the weather turns

Agreed with the installer

Takes away packaging and rubbish
Removes the old system
Patches old holes and marks
Paints the patches

Other questions about installation day

Do I need to tell my insurer?

It is worth a call. Check with your home and contents insurer before work starts that you are covered for it.

Can the installation be done while I am at work?

Most of it can, if someone lets the installers in and is back for the handover. The decisions at the start of the day are the ones that are hard to make by phone, so be there for those if you can.

Is it better to install in winter or summer?

Either works. Installers are busiest once the hot weather arrives, and waits are longest then. Booking ahead of the season gives you more choice of dates.

What should I check on the quote before the day?

That it names the equipment by brand and model, says what is included and excluded, and covers the electrical work. See the guide to the electrical work in a quote.