Installing a coolroom in leased premises: what to settle first
What to settle with the landlord and the council before a coolroom goes into leased premises, and what is left for the quote, with a checklist to fill in.
Last updated
Before a coolroom goes into premises you lease, get the landlord's consent in writing to the room, to where its refrigeration plant goes, to the electrical work and to any hole through a wall, roof or floor. In the same exchange, agree who owns the room, who maintains it and whether it comes out when the lease ends. The refrigeration quote then covers a room the landlord has already agreed to.
How to use this guide
Step 1: Read the lease
Find the clauses on alterations, use, repairs and make good.
Go to Lease clausesStep 2: Fill in the checklist
What the lease says, what the landlord has agreed and what is still open.
Go to the recordStep 3: Call
Bring the checklist to the site assessment, or read it out when you call.
Call (03) 5153 2650
What does the landlord decide, and what does the quote decide?
A coolroom in leased premises raises three sets of questions. Some belong to the lease and the landlord, some to the council, and only the last set to the refrigeration quote. Sorting them early stops a quote being drawn up for a room the landlord or the council will not allow.
| Question | Who settles it | What to get |
|---|---|---|
| Can a coolroom go in at all? | The lease and the landlord. In most cases a tenant needs the landlord's written approval before changing leased premises. | The landlord's consent in writing. |
| Where the refrigeration plant goes: on the room, on an outside wall, on the roof or in the yard | The landlord. The walls and the roof are the building's structure. In a building with an owners corporation, its authority may be needed too. | Consent that names the place, marked on a plan. |
| Holes through a wall, roof or floor for pipes, cables and the drain | The landlord. | Consent that covers each one, and who seals it if the room comes out. |
| Power: a new circuit, work at the switchboard or a bigger supply | A licensed electrician works out what is needed. The landlord agrees to work on the building's switchboard and supply. | The electrician's advice, and consent for the work. |
| Whether a building or planning permit is needed | Your council's building and planning departments, or a private registered building surveyor. | Their answer in writing. |
| What the food regulator wants to see of the fit-out | Your council's Environmental Health Officers for most food businesses. Safe Food Victoria (opens in a new tab) for dairy, meat and seafood businesses. | Their advice before work starts. East Gippsland Shire Council recommends having floor plans assessed first. |
| Who owns, maintains and removes the room | The lease and the landlord's consent. Your lawyer can tell you what your lease means. | The answer in writing, before the room goes in. |
| The room itself: size, temperature, panels, plant, drain and timing | The refrigeration quote, after a site assessment. | Your project brief, then a quote. |
The council steps in the table are East Gippsland Shire Council's steps for starting a new food business (opens in a new tab). Other councils in Gippsland have their own, so ask yours.
If the building has an owners corporation, a lot owner must not alter the common property unless the owners corporation has authorised it, as Consumer Affairs Victoria (opens in a new tab) explains. Ask your landlord whether the roof, the outside walls or the yard are common property.
What to look for in your lease
If your premises are used wholly or mainly to sell or hire goods or to provide services by retail, the lease may be a retail lease under Victoria's Retail Leases Act 2003. The Victorian Small Business Commission (opens in a new tab) (VSBC) explains that the Act may also apply where the buyers are other businesses. Some premises are outside the Act (opens in a new tab), including premises leased for certain farming operations, so check before you rely on the retail lease rules below.
Under a retail lease, the landlord must give you a disclosure statement and the proposed lease at least 14 days before you enter into the lease, as the VSBC's information brochure for tenants (opens in a new tab) sets out. Between them, these documents answer most of the questions above.
| Document or clause | What to look for |
|---|---|
| The disclosure statement | The structures, fixtures, plant and equipment the landlord provides, the permitted use, and any works, fit-out or alterations. A coolroom or refrigeration plant on that list was provided by the landlord. |
| The alterations or works clause | Whether changes need the landlord's approval, and how to ask for it. |
| A trades clause | Whether the lease says to use a trade worker the landlord chooses. |
| The permitted use | Whether storing and handling food fits within it. The VSBC also suggests checking how long any permits from the council would take. |
| The repairs clause | Who looks after plant. Under a retail lease the Act sets the landlord's repair duties, with exceptions, and they form part of the lease even where it says otherwise. The next section covers them. |
| The make good clause | The condition you have to leave the premises in when the lease ends. |
| The term and any options | How many years are left, counting options to renew. That is how long the room has to earn its place before the end of the lease. |
| The condition report and your photos | How the floor, walls and ceiling looked when you moved in. Where make good means returning the premises to their starting condition, this is your evidence of it. |
If you have not signed yet, the VSBC advises having a lawyer experienced in retail leasing review the lease before you sign anything. Raise the coolroom then, while the lease can still be changed.
Who maintains a coolroom in leased premises?
Start with whether the room came with the premises. The disclosure statement lists the plant and equipment the landlord provides.
For a retail lease, the VSBC explains (opens in a new tab) that section 52 of the Act makes the landlord responsible for maintaining the structure of the premises, the landlord's fixtures, the plant and equipment at the premises, and the appliances, fittings and fixtures the landlord provides for services such as gas, electricity and water. They are kept in the condition they were in when the lease was entered into. The landlord is not responsible where the repair arises from the tenant's misuse, or where the lease entitles or requires the tenant to remove the item at the end of the lease. The VSBC's 2026 brochure adds the case where the tenant has agreed to maintain essential safety measures.
The VSBC's guidance does not deal with a room a tenant adds during the lease. For that, the lease and the landlord's written consent set who maintains it and who pays for repairs, and your lawyer or the VSBC can read them with you. Settle both in writing before the room goes in.
Ownership belongs in the same conversation. Business Victoria (opens in a new tab) suggests talking with the landlord about whether your changes can be permanent or have to be reversed at the end of the lease, and asking whether the landlord will pay for any of them.
Whoever is responsible, a coolroom needs regular servicing, so agree who books it and who keeps its records. Our commercial refrigeration maintenance page explains what a service covers.
What to ask the landlord to agree to
Put the request in writing, with a plan of the room and the plant, and ask for the answer in writing too. Besides the questions in the table at the top of this guide, cover these:
- Around the plant: the warm air and the sound it gives off where it goes. A condenser needs a place where air moves freely and the heat can get away, clear of other heat sources.
- The drain: where water from the evaporator will run to.
- Access: for the build and for servicing afterwards, including any hours or rules the building sets and any trades the landlord requires.
- The end of the lease: whether the room stays, has to come out or may come out, and the state the premises must be left in.
How the kind of plant changes the request
Most coolrooms are refrigerated by a one-piece unit or a split system, and the two ask different things of the building.
| What the landlord is asked about | One-piece unit | Split system |
|---|---|---|
| Holes for refrigerant pipes | None. It is charged with refrigerant at the factory, and no refrigerant pipes are run on site. | Holes for the pipes that join the two units, through each wall, roof or floor they cross. |
| Where its heat goes | Out of the side that faces away from the room, into the space around it. That space needs air moving through it. | Out of the condenser, outdoors or in the plant room. |
Which suits your room is decided at the site assessment, and the coolroom installation page compares them.
Power needs care in a leased building. In Victoria, all fixed electrical installation work needs a licensed electrician. Work on the main switchboard is prescribed electrical installation work, and Energy Safe Victoria (opens in a new tab) says it needs an independent inspection before the Certificate of Electrical Safety is issued. If the switchboard is in a part of the building the landlord controls, make sure the consent covers it.
You may need the site assessment to write a precise request: the landlord will want to know where the plant would go, which holes it needs and what the power involves, and that is what the assessment works out. Fill in the checklist first, so the gaps are clear.
What happens to the coolroom when the lease ends?
The make good clause sets the condition you leave the premises in. The VSBC gives as examples (opens in a new tab) removing the fit-out, repairing damage above fair wear and tear, and returning the premises to the condition they were in at the start of the lease. If the room has to come out, this is what that involves.
| Part | What happens | Who does it |
|---|---|---|
| The refrigeration plant | Shut down and taken off. In Australia, work that involves handling a scheduled refrigerant, or a part of the equipment that could release one, needs a refrigerant handling licence, which the Australian Refrigeration Council (opens in a new tab) administers. | A licensed refrigeration technician. |
| Power | The fixed wiring to the room and the plant is disconnected and made safe. | A licensed electrician. |
| Panels and door | Taken down. A modular panel room can be moved to another site and rebuilt. | The refrigeration contractor. |
| Holes and fixings | Holes through walls, the roof or the floor are sealed, and fixings removed, to the standard the make good clause asks for. | As the lease or the consent says. |
Before the lease ends, the VSBC suggests walking through the premises with the landlord early, and preparing a full inventory of all fit-outs and fixtures to share with them. If the landlord says something can stay, get that in writing. If the room is going with you, see the guide to planning a modular coolroom relocation.
Documents to take to the landlord and to the site assessment
| Document | Who needs it, and why |
|---|---|
| A floor plan with the room and the plant marked | The landlord, because it is what they are consenting to. Us, because it shows the space, the way in and where warm air would go. |
| Your project brief | Us, to size the room and its plant. The landlord, to see what the room is for. The coolroom installation page has a project brief to fill in. |
| The landlord's written consent and its conditions | Us, because the quote has to fit them: where the plant may go, which holes are allowed, and when work can happen. |
| The building's asbestos register | Us, before any hole is cut. The owner of a commercial building leased to a business must keep an asbestos register and provide it to contractors doing work that may involve exposure, as the Victorian Government's asbestos website (opens in a new tab) explains. Ask the landlord for it. |
| The disclosure statement's list of the landlord's fixtures and plant | Us, to know whether an existing circuit, drain or piece of plant is the landlord's. |
| The condition report and your photos from the start of the lease | You and the landlord, as the record of how the premises started. |
| The answers from the council or Safe Food Victoria | The landlord, who may ask for them. Us, if they set conditions on the room. |
| The switchboard: where it is, a photo, and single-phase or three-phase if you know | Us and the electrician, to tell whether the supply can carry the room. |
How do you keep stock cold while the work is done?
A room built in premises that are already trading, or one that replaces old storage, leaves gaps in your cold storage. Plan where the stock goes before the dates are fixed. Potentially hazardous chilled food is kept at 5°C or below, unless the business can show another temperature is safe, and frozen food stays frozen, as Safe Food Australia (opens in a new tab) explains the food standards.
| Stage | What it means for your cold storage | What to plan |
|---|---|---|
| Clearing the space | Fridges or shelving where the room will stand have to move first. | Where they go, and whether they need a power point there. |
| Electrical work | Power to parts of the premises can be off while an electrician works at the switchboard. | Ask the electrician what will be off, and for how long. |
| Start-up | We bring the room down to temperature and check it before stock goes in. | Book no deliveries into the room until it has been handed over. |
| Old storage coming out | Cabinets or an old room go out of service. | Overlap the old and the new where you can. |
| The end of the lease | The room stops cooling when its plant is shut down for removal. | Run stock down, or move it, before that day. |
To bridge a gap, run stock down before the work, use cabinets you already have, or hire cold storage for the period. ABL hires out coolrooms: see the coolroom hire page. Keep a temperature log for stock held anywhere temporary, and see the guide to a temperature record sheet for a coolroom.
Coolroom lease checklist
When to bring ABL in
Once you have the lease answers and the landlord is willing in principle, the site assessment settles the room itself: its size, the panels, the plant and where it goes, the drain and the power. ABL builds coolrooms in new and existing buildings, and our coolroom installation page explains how a project runs. Send the checklist with your enquiry, or have it in front of you when you call.
If the landlord's storeroom could become the cold room, see the guide to converting an existing room into a coolroom. For where the room and its plant should go, see the guide to an indoor or outdoor coolroom.
Sources (18)
Checked on 19 November 2026
- Victorian Small Business Commission: retail leases information brochure for tenants, published 1 June 2026 (opens in a new tab)
- Victorian Small Business Commission: what are retail premises?, updated 7 January 2025 (opens in a new tab)
- Victorian Small Business Commission: premises not covered by the Act, updated 1 March 2023 (opens in a new tab)
- Victorian Small Business Commission: repairs and maintenance, updated 1 March 2023 (opens in a new tab)
- Victorian Small Business Commission: preparing for end of lease, updated 30 June 2023 (opens in a new tab)
- Business Victoria: set up your premises, updated 15 September 2022 (opens in a new tab)
- Consumer Affairs Victoria: maintaining and improving common property, updated 12 November 2021 (opens in a new tab)
- Victorian Asbestos Hub: property owner and manager duties, modified 30 September 2026 (opens in a new tab)
- East Gippsland Shire Council: food businesses and stalls (opens in a new tab)
- Safe Food Victoria: home page, updated 10 November 2026 (opens in a new tab)
- Food Standards Australia New Zealand: Safe Food Australia, chapter 3.2.2 (opens in a new tab)
- Energy Safe Victoria: Restricted Electrical Worker licence, reviewed 1 July 2026 (opens in a new tab)
- Energy Safe Victoria: Certificate of Electrical Safety (opens in a new tab)
- Australian Refrigeration Council: frequently asked questions, refrigerant handling licence (opens in a new tab)
- Daikin: monoblock refrigeration unit explained (opens in a new tab)
- INTARCON: what are monoblock refrigeration units (opens in a new tab)
- Australian Government, energy.gov.au: refrigeration guide for businesses (opens in a new tab)
- ABL Refrigeration: commercial refrigeration services (opens in a new tab) ABL's own page.
Related pages
- Planning a modular coolroom relocation
If the room goes with you when the lease ends.
- Indoor or outdoor coolroom: choosing a location
Where the room and its plant should go on the site.
- Converting an existing room into a coolroom
If a storeroom in the premises could become cold storage.
Planning a coolroom in leased premises?
Send ABL your checklist with an enquiry, or call and talk it through.
Filled in the record? Copy or print it first: it is not sent with a call or an enquiry.
