Pre-summer maintenance for business air conditioning: a calendar for the year
When to book business air conditioning maintenance before summer and winter, what should trigger an extra visit, and a calendar to fill in for each unit.
Last updated
Book the pre-summer service for early spring, so that anything it finds can be fixed before the first hot week. Around Bairnsdale that means September or October for cooling, and March or April for the heating check before winter. Then build the rest of the year around each unit: what its maker asks for, how hard it works, and the events that should trigger an extra visit. The calendar in this guide has a line for each.
How to use this guide
Step 1: Set the two seasonal dates
A cooling check in spring and a heating check in autumn.
Go to Seasonal datesStep 2: List the units
Give each unit its own line: the maker's schedule, the work it does and where it sits.
Go to Unit by unitStep 3: Fill in the calendar
Add the visits, the triggers to watch and who follows up.
Go to the record
When should a business book its pre-summer service?
We recommend a service at least once a year, ideally before summer. The reason for doing it early is simple: a fault found in September can be fixed in September. A fault found in the first heatwave waits its turn with everyone else's. The Bureau of Meteorology's records for Bairnsdale Airport (opens in a new tab) show how the year runs.
| Months | What the weather does | What to book |
|---|---|---|
| September and October | Average daily maximum of 18°C to 20°C. About one day in October reaches 30°C. | The pre-summer service. The system is not yet needed every day, so a unit can be off for a part to arrive. |
| November to March | The hot days: on average about two in November, four in December, six in January, five in February and three or four in March reach 30°C. | Nothing planned, if spring went well. Keep filters clean and report a fault the day you notice it. |
| March and April | Average daily maximum falls from about 24°C to 21°C. | The heating check, before the first cold week. |
| June to August | Average daily minimum of 4°C to 5°C, and an average maximum near 15°C. | Heating season. A second service here suits systems that run every day. |
A pre-summer service covers filter cleaning, refrigerant checks, electrical testing and an inspection of the components, and the system is run in cooling before we leave. The manual for each model adds its own list: coils, drains, fans and, for larger systems, a yearly leak test.
Build the calendar from each unit, not from the building
Two units of the same model can need different attention. One cools a quiet office five days a week. The other serves a workshop door that is open all day. A calendar built for "the building" gives both the same visits, which is too many for one or too few for the other. Give each unit a line, and fill it in from three things.
| Input | Where to find it | What it changes |
|---|---|---|
| The maker's schedule | The maintenance section of the installation or owner manual for that model. It should be in the handover folder. | The tasks and the base interval. This is the floor: do not go below it. Service by unqualified people can void the warranty. |
| How hard the unit works | The hours a day and the days a week it runs, and whether it both heats and cools. | A unit that runs every day needs more visits than one that runs for a few weeks a year. |
| Where it sits | Near the coast, beside an unsealed car park, in a workshop, above a kitchen, or in a clean office. | Dust, salt and grease load filters and coils faster, so those units are inspected more often. |
No single interval suits every unit. As a range: at least one service a year, two for a commercial system that runs daily or a site near the coast, and as often as every three months where the schedule for the model asks for it. Some sites need more. Where the schedule for your model and the general advice differ, the schedule for the model decides.
Owner-level care is on the calendar too. Where the manual for a model tells the owner to clean the filters, it also says how often: for wall mounted split systems that is commonly every two weeks in regular use. Put a name beside that task, not just a date.
Events that should trigger an extra visit
A calendar handles what is predictable. These events are not on it, and each one is a reason to have the system looked at whatever the date.
| Trigger | What it does to the system | What to arrange |
|---|---|---|
| A dusty site or a dusty season | Dust from a workshop, a farm, an unsealed road or harvest loads the filters and the coils faster than the calendar assumes. | Inspection by condition: have the filters and coils looked at more often, and let what is found set the next date. Outdoor coils on a dusty site are cleaned more often than once a year. |
| A fitout or building work | Plaster and cutting dust is drawn into any unit that runs while the work is going on, and it settles in filters, coils and drains. | An inspection and a clean before the area is reoccupied. Ask the builder how the system will be protected while the dusty work is done. The guide to air conditioning checks before a commercial fitout covers the rest. |
| A long closure | A system that has sat idle for months has dust on its filters, and a controller that may have lost its clock and its schedules. | A start-up check before people return: filters cleaned, the air paths of the indoor and outdoor units clear, and the system run in the mode the season needs. |
| More people, more equipment or longer hours | The system does more work than the calendar was built for, and a system that coped may no longer do so. | A review of both the service plan and the system itself. Tell your provider what has changed before the next visit, not at it. |
| A seasonal reopening | A business that shuts for the off season starts its busiest weeks with a system that has not run. | The start-up check two to four weeks before opening day, with the schedules set for the new trading hours, so there is time to get a part. |
| A storm, a flood or a power event | Water, debris and power surges damage outdoor units and controls. | An inspection before the system goes back into normal use. The guide to water near commercial air conditioning covers what to record and who to call. |
| The same fault twice | A repeat fault means the cause was not found the first time. | A proper diagnosis, and a look at whether the unit is worth more repairs. See the guide to repairing or replacing a commercial air conditioning system. |
The heating check before winter
A reverse cycle system heats with the same equipment it cools with, so a system that has cooled all summer has not been tested in heating since last year. Book the heating check for March or April. It covers the same ground as the spring visit, with the system run in heating: the indoor units deliver warm air, the outdoor unit runs and defrosts as it should, and the schedules are changed to winter hours.
Two things are worth knowing before the first frost. An outdoor unit that stops now and then to melt frost off its coil is working normally: the guide to frost on the outdoor unit in winter explains what is normal and what is not. And for people at work there is a figure to plan against: WorkSafe Victoria's compliance code for workplace facilities (opens in a new tab) says a workplace where people do seated or desk work should be kept at between 20°C and 24°C, depending on the time of year and the clothing worn.
Halls, clubs and venues with uneven use
A community hall, a sports club or a function room can sit empty for weeks and then hold a hundred people for an evening. A calendar built on a trading week does not fit. Build this one on the events instead.
- Service before the season of events, not on a fixed month. For a hall that is busy from November to March, that is early spring.
- Check after a long quiet spell, the same way as after a closure.
- Leave a plain guide beside the controller. The person who opens up for a hire may never have used it. Say how to turn it on, what to set, and how to turn it off.
- Use the timer. A system left running after an event runs until the next person comes in.
- Give one role the job. On a committee, the task belongs to a position, such as the secretary or the facilities officer, so that it survives a change of people.
- Keep the reports in one folder that is handed on with the role.
A calendar for several buildings
With more than one site, the risk is that the visits get coordinated and the units get forgotten. Group the visits by location to save travel, and keep one line for each unit all the same.
- One asset list for all sites, with a label on each unit that matches its line.
- The sites that matter most go first in spring, so they are done before the heat.
- One format for every report, so that a finding at one site can be compared with another.
- One person receives every report and decides what is followed up.
- The triggers still apply site by site. A fitout at one building does not wait for the round.
The guide to commercial air conditioning asset registers covers the list this depends on.
Run hours: useful, with limits
Some commercial controllers and building management systems count the hours each unit has run. Ask your provider whether yours does. Where it does, the figure is worth having on the calendar, because many maintenance tasks fall due by run time: a unit that has run three times as long as its neighbour has done three times the work, and its visits can be set by hours as well as by months.
It does not replace looking. Run hours say how long a unit worked, not what it breathed in. A unit with few hours in a dusty shed can be dirtier than one with many hours in a clean office. And a system with a developing fault often compensates for it and keeps the room comfortable, so neither the hours nor the room temperature gives the fault away. Use the hours to decide how often, and an inspection to decide what.
Who keeps the records, and who follows up
A visit that produces a report nobody reads has done half its job. Decide these once, and write them on the calendar.
| Record | Who keeps it | What happens next |
|---|---|---|
| The service report for each visit | One named person in the business, filed against the unit. | Every recommendation gets a decision: do it now, plan it, or decline it and say why. |
| The fault log | Whoever staff report faults to. | The log goes to the technician before each visit, so repeat faults are seen as repeats. |
| The logbook, where the system has one | It stays with the system. The refrigerant handling code of practice (opens in a new tab) has one supplied for a system that holds more than 3 kg of refrigerant. | The technician brings it up to date at each visit. |
| Owner-level tasks | The person named beside the task. | A tick and a date each time, so a missed month shows. |
| Essential safety measure records | The building owner. The Building and Plumbing Commission (opens in a new tab) says owners must keep records of maintenance checks and repairs for essential safety measures, which can include air handling systems used to manage smoke. | They feed the owner's annual report. Ask the owner or a building surveyor whether any of your systems are covered. |
Maintenance calendar for each unit
Booking the work
ABL services air conditioning for businesses in Bairnsdale and East Gippsland. Our air conditioner servicing page covers what a service involves, and the enquiry form is on our air conditioning services page. Send your calendar with the enquiry, and book the spring visit before spring.
Two guides go with this one. The guide to commercial maintenance agreements covers what to ask of a provider, and the guide to planning maintenance for an annual shutdown covers the jobs to save for a closed period.
Sources (13)
Checked on 19 November 2026
- ABL Refrigeration: air conditioning services (opens in a new tab) ABL's own page.
- Bureau of Meteorology: climate statistics for Bairnsdale Airport (opens in a new tab)
- ActronAir: installation and commissioning guide, variable capacity commercial ducted indoor unit, version 4 (opens in a new tab)
- ActronAir: installation and commissioning guide, commercial split ducted outdoor unit, version 8 (opens in a new tab)
- Daikin: maintenance tips (opens in a new tab)
- Mitsubishi Electric Australia: operating instructions, MSZ-AP series split system (opens in a new tab)
- Australian Government, energy.gov.au: HVAC equipment guide for business (opens in a new tab)
- NSW Government: I am your optimisation guide, heating, ventilation and air conditioning systems, 2015 (opens in a new tab)
- WorkSafe Victoria: compliance code, Workplace facilities and the working environment, December 2023 (opens in a new tab)
- WorkSafe Victoria: designing a healthy and safe working environment, reviewed 7 April 2025 (opens in a new tab)
- Australia and New Zealand refrigerant handling code of practice, part 2, 2025 edition (opens in a new tab)
- Building and Plumbing Commission: essential safety measures (opens in a new tab)
- ASHRAE: economic analyses and life-cycle costs, with equipment service life tables (opens in a new tab)
Related pages
- Commercial air conditioning maintenance agreement questions
What to compare between providers before you sign.
- Annual shutdown HVAC maintenance planning for a business
The jobs to save for a closed period, and the order to do them in.
- Commercial air conditioning: repair or replace decision guide
What to do when a service finds a unit that keeps failing.
Time to book the pre-summer service?
Send ABL your maintenance calendar with an enquiry, or call to book a visit.
Filled in the record? Copy or print it first: it is not sent with a call or an enquiry.