Commercial air conditioning site survey: what to have ready

What to gather before a commercial air conditioning site survey: room use, equipment records, access and approvals, with an information pack to fill in.

Last updated

A site survey goes faster, and the quote that follows is firmer, when the person doing it is handed four things: how each room is used, what equipment is there now, what they will need to get to, and who has to approve the work. You do not have to judge whether anything is adequate. Record what is there and what you know, and leave the assessing to the person who is qualified to do it. The information pack in this guide holds it all in one place.

How to use this guide

  1. Step 1: Gather

    Room by room, write down the use, the people, the hours and the equipment.

    Go to Room use
  2. Step 2: Fill in the pack

    Add the equipment records, what you can see, and who approves what.

    Go to the record
  3. Step 3: Send it ahead

    Paste the pack into your enquiry, so it arrives before the visit.

    Call (03) 5153 2650

What is a commercial air conditioning site survey?

It is the visit where the contractor works out what the building needs before they design or price anything. A commercial system is sized from a heat load calculation, not from the floor area alone, and the size is only as good as the information behind it. A system that is too big or too small costs more to run and is less comfortable than one that fits.

On a survey we measure the rooms and look at the windows, the insulation and the sun. We count the people and the equipment that gives off heat. We look at the existing plant, the electrical supply, and the routes that pipes, drains and cables could take. And we look at how the equipment would be brought in, and how it would be reached for servicing afterwards. Your pack answers the questions we cannot answer by looking: who uses each room, when, and what has gone wrong before.

How each room is used

Make one line for each room or area the system serves, or will serve. A floor plan with notes on it is ideal. A list is fine.

What to record for each room
RecordWhy the assessor needs it
What the room is used forAn office, a shop floor, a treatment room and a storeroom all need different things from the system.
How many people use it, usually and at its busiestPeople are a heat load and need outside air. A meeting room that fills for an hour a day is designed differently from a desk area.
The days and hours it is in useA room used at night or at weekends may need to run when the rest of the building is off.
Equipment that gives off heatComputers, servers, printers, fridges, ovens, display lighting and machinery all add to what the system has to remove.
Windows and sunWhich way the glass faces and when the sun comes in. West-facing glass in the afternoon is a large load.
What is wrong with it nowToo hot, too cold, stuffy, draughty or noisy, and at what time of day or year. This is the most useful line in the pack.
Anything that must stay at a set temperatureStock, medicines, equipment rooms and the like. Say what temperature, and whether it matters around the clock.

The number of people matters more than most owners expect. WorkSafe Victoria's office health and safety guidance (opens in a new tab) points to the ventilation standard, which it says recommends at least 10 litres of outdoor air a second for each person in an office and allows about 10 square metres of floor for each person. A room that packs people in more tightly needs more outside air, so give real numbers, not the number of chairs.

Records of the equipment you have now

If there is air conditioning in the building already, gather what you have on it. Missing items are worth listing too: knowing there are no drawings is useful.

  • A photo of each nameplate. The plate on the outdoor unit, and on the indoor unit where you can see it, gives the brand, the model, the serial number, the capacity and the refrigerant.
  • A photo of each unit and each controller, taken from where you can stand safely.
  • Which unit serves which rooms, as far as you know.
  • The age of each system, or the year it was installed.
  • Drawings and manuals. Floor plans, air conditioning drawings, the handover folder from the last installation, and the manuals for the controllers.
  • Service and fault history. Service reports, repair invoices and a note of any fault that keeps coming back.

Take photos only from the ground, a window or another place you would normally stand. If the plant is on a roof, write "on the roof" and leave it at that. The guide to an air conditioner that is not cooling or heating has a drawing of where to find the nameplate on a split system.

What you can see of the constraints

These are the things that most often change a design or a price. Note what you can see and what you know. Whether any of it is good enough is for the assessor, and for the electrician where it is electrical.

What to note, and what to leave alone
Look atWrite downLeave alone
The switchboardWhere it is, who holds the key, and anything you know about its age or the last time it was upgraded.The board itself. Do not open it. In Victoria fixed electrical work is for a licensed electrician (opens in a new tab), and an electrician is also the person to say what the supply can carry.
CeilingsThe type in each room: tiles in a grid, plasterboard, or open to the roof. The height, and where the access hatches are.The tiles and the hatches. Do not lift them. The space above can hold cables, dust and, in an older building, asbestos.
Outlets and grillesWhere the air comes out and where it goes back in, and any outlet that is closed, taped over or barely blowing.Dampers and anything inside a grille.
WaterStains on a ceiling, drips, a tray or a bucket someone has put under a unit, and where the drain pipes come out.The drains and the trays.
Outdoor unitsWhere each one sits, what is close to it, how it looks, and how near the neighbours are.The units, their pipes and their cables.
Getting in and getting upHow the roof is reached, where a truck or a crane could stand, the width of doors and stairs, the lift, and the hours work can be done.The roof. Do not go up to look.

Noise belongs on this list where an outdoor unit could sit near a bedroom window or a neighbouring business. Note what is on the other side of each wall or fence. The guide to commercial air conditioning noise covers what the assessor will weigh.

Approvals, and who is responsible for each

A design that cannot be approved is wasted work. Find out who has a say before the survey, and put a name beside each one in the pack.

Who may have to approve the work
WhoWhat to find out
The landlord or building managerWhat the lease says about altering the air conditioning, fixing plant to the roof or walls, and who owns the equipment at the end of the lease. Whether consent has to be in writing.
An owners corporationIn a strata building, the rules about plant on common property and where outdoor units may go.
A building surveyorWhether the work needs a building permit. The Building and Plumbing Commission (opens in a new tab) says all building work requires one unless the regulations exempt it, and suggests asking your council or a building surveyor.
The councilWhether the work needs a planning permit as well. The council issues planning permits and can tell you whether one applies.
Whoever manages the workplaceThe asbestos register. WorkSafe Victoria says asbestos likely to be disturbed must be identified before refurbishment work starts (opens in a new tab), and in a leased building the register is usually held by the owner.
The person who signsWho in your business approves the quote, and who the contractor deals with day to day.

If the occupancy permit for the building lists air handling or mechanical ventilation among its essential safety measures (opens in a new tab), put a copy in the pack. Work that alters a building may affect them, and a building surveyor can say what has to be done.

Questions to leave for the assessor

You will finish the pack with questions you cannot answer. That is the point of it. Write them down so that none is forgotten on the day. These are the ones we are asked most often:

  • Can any of the existing system be kept: the ducts, the pipes, the drains, the controls?
  • Can the electrical supply carry the new system, and who finds that out?
  • Where can the outdoor units go, and how do they get there?
  • Does each room get enough outside air, and what would it take if it does not?
  • How long would each area be without air conditioning during the work?
  • Which permits or consents does this job need, and who applies for them?
  • How will the system be reached for servicing once it is in?

A good survey ends with an answer, or a named person who will find the answer, for each question on your list.

Site survey information pack

Commercial air conditioning site survey information pack

Fill in what you know and leave the rest blank. Use a second copy if you have more than three rooms. Attach your photos and drawings when you send it.

Your answers stay on this open page. They are not saved or sent. Copy or print them before you leave.

The site

The job

Room 1

Room 2

Room 3

Existing equipment

Drawings and manuals
Service records

What you can see

Approvals and questions

Asbestos register

What you should get back

A survey should come back to you as a proposal you can check against your pack. Look for the areas served, the people and equipment allowed for in each, the equipment proposed, what is being kept, what the electrical work includes, how the plant gets in, and which approvals the price assumes. If a room in your pack is missing from the proposal, ask why.

Three guides pick up from here. The guide to writing a commercial air conditioning project brief turns the pack into a scope you can send to more than one contractor. The guide to comparing commercial air conditioning quotes lines the proposals up. And the guide to budgeting for a commercial air conditioning replacement lists the cost lines beyond the equipment. If the survey is for a fitout, start with the guide to air conditioning checks before a commercial fitout.

ABL surveys, installs and replaces air conditioning for businesses in Bairnsdale and East Gippsland. As at November 2026, ABL offers a free site assessment and a free quote. Our commercial air conditioning page covers the service, and the enquiry form is on our air conditioning services page.