Writing a commercial air conditioning project brief
What to put in a commercial air conditioning project brief: the problem, the spaces and hours, who decides, the scope and what contractors send back.
Last updated
A project brief tells contractors what your business needs from the air conditioning, not how to build it. Write down the problem and the outcome you want, the spaces and when they are used, your priorities, budget and timing, where the job starts and stops, who decides, and what each contractor must send back. Leave the design to the people pricing it: the heat loads, the type of system, the sizes and the routes. One clear brief, sent to every contractor, gets you offers you can compare.
How to use this guide
Step 1: Describe the need
The problem, the outcome, the spaces and the hours.
Go to Problem and outcome
What a project brief does, and what it leaves out
The site survey information pack records the facts of each room. The brief adds what only you can decide: what the job is for, what is in it and what is not, and what you expect back. The guide to comparing commercial air conditioning quotes lines up the offers.
Start with the problem and the outcome
Write the problem as the business sees it, in plain words, with the facts that show it: when it happens, where, how often, and what it costs you. Then write the outcome that would solve it. Leave the solution out, unless you have a reason to require one.
| Instead of | Write, for example |
|---|---|
| "The air conditioning is old and needs replacing." | The two ducted systems on the shop floor were installed about 18 years ago. They broke down three times last summer, each time on a trading day, and the front of the shop is uncomfortably hot by mid-afternoon in summer. |
| "We need a bigger system." | The meeting room seats 12 and is used for training two days a week. With the door shut it becomes stuffy within the hour. |
| "Put in a VRF system." | Six offices and a meeting room each need their own temperature control. The meeting room is often in use while the offices are empty. |
| "Make it efficient." | We expect to stay at least ten years, so running cost matters more to us than the purchase price. Show the expected yearly energy use and how it was worked out. |
| "It must be quiet." | The only place for outdoor units is the east boundary, near a neighbour's bedroom window. See the guide to commercial air conditioning noise. |
Give each outcome something you can check once the system runs: a room that stays comfortable at its busiest, rooms on the same zone that stay within 2°C of each other, a noise limit at the boundary. The designer turns those into numbers. Your part is to say what success looks like. If you do need a particular system or brand, for example to match plant already on site or because the landlord's fitout guide requires it, say so and say why.
Spaces, hours and what each needs
List every area the job covers, with its use, the number of people at its busiest, its hours and days, and the equipment in it that gives off heat. The site survey pack collects this room by room, so attach it rather than write it twice. Then add what the pack does not ask:
- Which areas are air conditioned, which are only mechanically ventilated, and which rely on opening windows.
- Areas used out of hours, how that use is to be controlled and, in a shared building, how it is charged.
- Areas that need more than the rest: rooms that fill with people, such as meeting and training rooms; rooms with a lot of equipment; and rooms that need extra ventilation, such as a busy kitchen or a print room. Missing these is a common cause of complaints.
- Areas that must not lose air conditioning, such as a server room, and whether they need spare capacity or standby equipment.
- Changes you expect: more staff, a new tenancy, an extension, a different use for a room.
If the areas keep very different hours, the choice between one shared plant and separate local systems may be the first decision. See the guide to central air conditioning or local systems.
Priorities, budget and timing
Put your priorities in order. The usual ones are a long life, low running cost, low maintenance and room to change later. They pull against each other and against the price, so a contractor who knows your order can design to it. Add what you need handed over at the end: the drawings, manuals, warranty papers and training listed in the guide to commercial commissioning and handover.
Decide whether to state a budget. A brief that gives one, with what it is meant to cover, lets contractors design to it and tells you early if it is unrealistic for the building. If the money is not yet approved, say the brief is for budget pricing only. The guide to budgeting for a commercial air conditioning replacement lists the cost lines to allow for.
Give the timing too: when the system has to be working, when work can be done around trading, and how long each area can be without air conditioning. The guide to replacing commercial air conditioning while the business stays open explains how to stage the work.
Separate your information from the contractor's design
Offers stop being comparable when it is unclear who works out what. Your brief supplies the facts only you know. The contractor, or a designer you engage, works out the rest and shows the working.
| You supply | The contractor or designer works out |
|---|---|
| The problem, the outcome and what success looks like | The design conditions, and the assumptions behind the calculations. |
| The spaces, their use, people, hours and equipment | The heat load of each space, and the method used to calculate it. |
| Areas that need their own control | The zones, and where the controllers and sensors go. |
| Your priorities and budget | The type of system, the options considered, and why one was chosen. |
| The limits: lease, landlord, neighbours, roof, access and hours | The equipment, its make, model and capacity, and where it goes. |
| The drawings and records you hold | A survey of the existing services, and what can be kept. |
There are two common ways to buy the design. On most small and medium jobs the contractor designs to your brief and installs, which is called design and construct. On larger or more complex jobs, such as central plant or a building with exacting requirements, a mechanical engineer designs the system first and contractors price the engineer's drawings and specification. There are points in between, where a designer takes the design part of the way. As a rule, the more complex the system, the more of the design should be settled before it is priced.
In Victoria, regulation 23 of the Plumbing Regulations 2018 (opens in a new tab) makes refrigerated air-conditioning work a class of plumbing work, from installing and commissioning the equipment to repairing and maintaining it, and the class includes any design work incidental to, or associated with, that work. Ask each contractor for the licence numbers and types of the people responsible for the installation. Refrigerant licences and plumbing registrations both have restricted classes that cover only certain small systems, and the guide to comparing commercial air conditioning quotes sets out what each covers.
Draw the boundary of the job
Most arguments on a commercial job start at the edges, where the air conditioning meets another trade, the landlord or the building. A short scope clause, or a line saying "by others", invites the reading that anything not listed is outside the contract. Name each interface instead, and say who does it:
| Interface | What to settle |
|---|---|
| Electrical supply and switchboard | Who assesses the supply, who does the electrical work, and who pays if the supply needs upgrading. Fixed electrical work in Victoria needs a licensed electrician (opens in a new tab). |
| Builder's work | Openings, roof penetrations and flashing, platforms and supports, pipes or ducts through fire-rated walls, and making good afterwards. |
| Ceilings | Who lifts and refits ceiling tiles, and who repairs damage. |
| Controls | What the controls must do, in words: schedules, after-hours use, who may change set points, and links to an existing building management system or the fire panel. The contractor designs the controls to that description. |
| Drainage | Where the condensate drains to. |
| The old plant | What is removed, by whom, and where it goes. Refrigerant is recovered by a licensed technician (opens in a new tab) before anything is taken away. |
| Landlord and neighbours | Permission and conditions of work, the building's fitout guide if there is one, and how the work avoids disrupting other tenants. |
| Approvals | Who finds out which permits apply, and who applies for them. |
| Commissioning | Who tests what at the end, and who from your business watches and accepts it. |
Who decides
Put names in the brief, not just roles. Contractors need to know who answers their questions, and you need to know who can say yes:
- who owns the brief and signs it off
- who approves the budget and signs the contract
- who gets consent from the landlord or the owners corporation
- who is the day-to-day contact for contractors
- who accepts the finished job at handover
- who is consulted along the way, such as the staff who work in the spaces
Sign the brief off before it goes out. A change after the offers arrive means pricing again. The site survey guide lists the approvals a commercial job can need and who usually gives them.
What each contractor should send back
Ask every contractor for the same design outputs, in the same order, so the offers line up:
- the design conditions, the assumptions behind the calculations, and the method used to calculate the loads
- the type of system, the options considered and why this one was chosen
- the make, model and capacity of each unit, for cooling and for heating
- a layout of the equipment, pipes and ducts that shows the zones
- the electrical supply the system needs, and what electrical work is included
- what is kept, what is removed, and what is left out
- the programme, and how long each area will be without air conditioning
- the commissioning tests, the handover documents and the training
- the maintenance the system needs, and the warranty and its conditions
- the licence numbers and types of the people responsible for the installation
- the price, with GST, broken into the lines your budget uses
Under-sized plant is a common cause of complaints about commercial air conditioning. Over-sized plant is no safer: it wastes energy running at part load, and over-sized cooling can leave the air humid. A load calculation shown with its method, before work starts, is how you catch either.
Moving to new premises
When the business moves, assess the new building's air conditioning against your brief. Do not assume your current units will move with you, or that what is there will suit how you work.
| Question | What to check |
|---|---|
| Does the system there suit how you will use it? | Ask for its drawings, maintenance records and the basis it was designed on: the temperatures, people and equipment it allows for. Check those against your brief area by area. A system designed for open offices may struggle with a training room or a rack of servers. |
| Who maintains it? | It depends on the lease. The guide to central air conditioning or local systems sets out the retail lease rule and how to tell whether yours is a retail premises lease, and the guide to commercial air conditioning asset registers lists the records to ask for before you take over. |
| Can your units come with you? | A split system can be taken down and reinstalled. Recovering the refrigerant and reinstalling the unit needs a licensed technician, and in Victoria the reinstallation is refrigerated air-conditioning work. Several makers' warranties do not cover a unit reinstalled away from its original location. Weigh the age and condition of the units, and the cost of moving them, against new equipment chosen for the new space. |
| What does the old lease require when you leave? | The make good clause (opens in a new tab) in your lease says what condition to leave the premises in. It may mean removing units you installed, or leaving the landlord's plant in working order. If the landlord agrees to something different, get it in writing. |
| Will the move change the load? | More people, more equipment or a different layout changes what the system has to do. Write the brief for the new layout, not the old one. |
Planning for temporary premises
If the business moves out for a while, for a refurbishment or after damage, decide what the temporary site has to do before you sign for it:
- Which activities move, and for how long. A few weeks in summer is a different problem from a few months over winter. Include stock, records and equipment such as a server that must stay cool.
- What has to be kept comfortable. For desk work, WorkSafe Victoria's compliance code on workplace facilities (opens in a new tab) says the workplace should be kept between 20°C and 24°C, depending on the time of year and the clothing worn. For active work it says indoor temperatures should generally not be kept below 18°C. It also says employers should consult employees about the temperature.
- What is there already. Whether the temporary premises have working air conditioning, who maintains it, and whether you may add to it.
- Portable units. A portable air conditioner needs its own power point, with no power board or double adaptor, a short exhaust hose to get its hot air out through a window or a wall, and somewhere for its condensate to go. Check the manual for the model for its clearances and the smallest room it may be used in.
- Fixed units for a short stay. A split system installed for a few months is installed, and later removed, by a licensed technician. Agree with the landlord what you may install and what you must take away.
Your project brief
Who to call
ABL installs, replaces and maintains air conditioning for businesses in Bairnsdale and East Gippsland. We look at the site before we quote. Our commercial air conditioning page covers the service, and the enquiry form is on our air conditioning services page. As at November 2026, ABL offers a free site assessment and a free quote. Send your brief with the enquiry.
Sources (23)
- ABL Refrigeration: air conditioning services (opens in a new tab) ABL's own page. Checked on 20 November 2026.
- ASHRAE Handbook, HVAC Applications, chapter 43: HVAC commissioning (opens in a new tab) Checked on 20 November 2026.
- Office of the Victorian Government Architect: government as informed client, updated 22 August 2024 (opens in a new tab) Checked on 20 November 2026.
- NATSPEC: TECHreport TR 03, specifying design and construct for mechanical services, October 2025 (opens in a new tab) Checked on 20 November 2026.
- NATSPEC: TECHreport TR 06, procurement past and present, April 2026 (opens in a new tab) Checked on 20 November 2026.
- NATSPEC: specification writing, October 2026 (opens in a new tab) Checked on 20 November 2026.
- NATSPEC: TECHnote GEN 021, scope of works clauses (opens in a new tab) Checked on 20 November 2026.
- NATSPEC: TECHnote DES 012, specifying BMS and automatic controls (opens in a new tab) Checked on 20 November 2026.
- NATSPEC: TECHnote DES 025, mechanical design and install HVAC checklist (opens in a new tab) Checked on 20 November 2026.
- ASHRAE Handbook 2024, HVAC Systems and Equipment, chapter 1: HVAC system analysis and selection (opens in a new tab) Checked on 20 November 2026.
- NSW Government: I am your optimisation guide, heating, ventilation and air conditioning systems, 2015 (opens in a new tab) Checked on 20 November 2026.
- NATSPEC: Simple Office Fitout reference specification, April 2025 (opens in a new tab) Checked on 20 November 2026.
- Government of Western Australia: technical guideline TG009, commissioning and handover, version 2.0 (opens in a new tab) Checked on 20 November 2026.
- Plumbing Regulations 2018 (Victoria), authorised version 010, regulation 23 (opens in a new tab) Checked on 20 November 2026.
- Australian Refrigeration Council: frequently asked questions (opens in a new tab) Checked on 20 November 2026.
- Energy Safe Victoria: electrical licence types, reviewed 1 July 2026 (opens in a new tab) Checked on 17 November 2026.
- Daikin Australia: can I take my split system with me when I move? (opens in a new tab) Checked on 20 November 2026.
- Daikin Australia: manufacturer's warranty card (opens in a new tab) Checked on 20 November 2026.
- Mitsubishi Electric Australia: air conditioning warranty card, 2025 (opens in a new tab) Checked on 20 November 2026.
- ActronAir: warranty terms, document 892A version 18, July 2025 (opens in a new tab) Checked on 20 November 2026.
- Victorian Small Business Commission: preparing for the end of a lease, 30 June 2023 (opens in a new tab) Checked on 20 November 2026.
- WorkSafe Victoria: compliance code, Workplace facilities and the working environment, December 2023 (opens in a new tab) Checked on 20 November 2026.
- Rinnai Australia: portable air conditioner operation and installation manual, RPC41MCWF (opens in a new tab) Checked on 20 November 2026.
Related pages
- Commercial air conditioning in Bairnsdale and Gippsland
The systems ABL installs and looks after for businesses.
- Commercial air conditioning site survey: what to have ready
The room-by-room facts to attach to your brief.
- Comparing commercial air-conditioning quotes
How to line up the offers that come back.