Skip to the content

Air conditioning an open plan office and the rooms around it

Plan air conditioning for an open plan office, its meeting rooms, lunchroom and any warehouse or depot office beside it, with a brief to fill in.

Last updated

Office air conditioning is designed from how each space is used: how many people are in it, what equipment runs, which way the glass faces and when the space is busy. An open floor, a meeting room, a lunchroom and an office beside a warehouse load the system differently, so they are usually zoned and controlled apart. Map the spaces, collect the complaints you already have, and put both in one brief before anyone sizes a unit.

How to use this guide

  1. Step 1: Map the spaces

    Who sits where, how many, what equipment runs, and when.

    Go to What drives it
  2. Step 2: Collect the complaints

    Where and when people are too hot, too cold or bothered by noise.

    Go to Complaints
  3. Step 3: Fill in the brief

    Then send it with an enquiry, or have it with you when you call.

    Go to the record

What drives the cooling in an office?

The cooling an office needs is the heat its people, equipment, lights and windows add, at the busiest time, plus the outside air brought in. These are the things to map for each space.

What to map for each space in an office
What adds loadWhat to note
PeopleHow many sit in each space at the busiest time. A meeting room can go from empty to full in a minute, and it gets hot and stuffy fast when it does.
EquipmentComputers and screens at every desk, printers and copiers, a kitchen, and any server or comms cupboard. Note anything that runs overnight.
LightingOrdinary office lighting, and anything stronger, such as studio or display lighting.
Sun on the glassWhich way each wall of glass faces and what shades it. The desks along a sunny wall need a different setting from the middle of the floor.
Outside airEvery office needs outside air. The National Construction Code (opens in a new tab) requires an office to have natural ventilation or a mechanical ventilation or air conditioning system complying with AS 1668.2, and WorkSafe Victoria's office guide (opens in a new tab) gives 10 litres a second for each person as the recommended minimum. A split system recirculates room air, so note how outside air reaches each space now.
HoursWhich spaces are used outside normal hours. A room used late or around the clock on the same system as everyone else keeps the whole system running.

For desk work, WorkSafe Victoria gives 20°C to 24°C as the range most people find comfortable, depending on the time of year and the clothing worn. The guide to fresh air for commercial split systems covers how outside air is brought in.

Open floors, private offices and meeting rooms

Most offices mix an open floor with rooms that close. Each kind of space behaves differently, and zoning that puts rooms with long or unscheduled hours on the same system as everyone else is one of the usual places energy is wasted.

How each kind of office space behaves
SpaceWhat is particularWhat usually helps
Open floorDesks along the glass and desks in the middle feel different conditions at the same time. A personal heater under a desk can trick a nearby sensor into cooling harder.Separate zones for the sunny edge and the middle, with sensors placed away from heaters, printers and direct sun.
Private offices and consulting roomsDoors stay shut, one or two people sit for hours, and quiet matters for confidential conversations.Each room on its own control, or grouped with rooms that face the same way. Quiet indoor units.
Meeting roomsEmpty most of the day, then full. Outside air and cooling sized for the room's area alone fall short when every chair is taken.A zone of their own that responds to the room filling, and outside air that rises with the number of people.
Coworking spaceThe mix of people changes daily, rooms are booked by the hour, and some members work late.Rooms on their own controls, schedules that follow bookings, and an after-hours setting that does not run the whole floor.
Real estate or other office with a shopfrontA reception by the street door, desks behind it, and interview rooms that fill for appointments.Treat the front as an entrance zone. See the guide to shopfront air conditioning with open doors.

An open floor is usually served by ducted units with zones, by ceiling cassettes, or by a multi-unit system that lets each zone run on its own. Our commercial air conditioning page compares the kinds, and the guide to central or local systems covers that choice.

Rooms that work differently

Office rooms that need their own thinking
RoomWhat is particularWhat to note
Call centreFull for whole shifts, sometimes around the clock, with people talking on headsets all day. Lowering the background noise (opens in a new tab) is one of the ways to reduce acoustic incidents, so quiet indoor units matter here.Seats, shift times, and the noise level the room is designed for.
Staff lunchroomEmpty, then crowded at breaks, with a fridge, a microwave, a kettle and a dishwasher adding heat. Food smells travel (opens in a new tab) through shared air, so an exhaust fan earns its place.Break times and numbers, the appliances, and whether it has an exhaust fan.
Photography or video studioStudio lights put out heat, the set and the layout change from job to job, and a recording picks up fan noise.The lighting used, the largest crew, and whether sound is recorded.
Security gatehouseA small room occupied around the clock, often by one person, with a door or window that opens to every vehicle.Hours, the window or hatch, and who to call if the unit stops overnight.
Administration office in a health facilityThe Australasian Health Facility Guidelines (opens in a new tab) say split systems should be avoided in patient care areas and confined to areas such as staff-only and non-patient care rooms and equipment rooms. Clinical areas have their own air quality requirements.Which rooms are offices and staff areas, and which are patient care, so the brief covers only the first.
Server or comms roomServers run around the clock, so they need cooling that keeps running (opens in a new tab) when the office system is off for the night. A small comms cupboard may need no more than a unit of its own.What is in the room, and whether it has its own cooling now.

Offices beside a warehouse, a depot or a packing shed

An office attached to a warehouse, a dispatch dock, a transport depot or a packing shed is a comfort job sitting next to an industrial one. The aim is to keep the office sealed from the working area, and to keep the working area's fumes out of the office's air.

  • Engine fumes. WorkSafe Victoria warns that petrol, diesel or gas forklifts working indoors can cause a build-up of fumes such as carbon monoxide (opens in a new tab), at loading docks among other places, and its diesel exhaust guidance (opens in a new tab) includes separating engines from the rest of the workplace and piping exhaust away from work areas. Note where vehicles idle and where forklifts run.
  • Where the office gets its air. The building code's indoor air quality handbook (opens in a new tab) says that where nearby sources spoil the outdoor air, the intake can be moved to reduce what is drawn in. An outdoor unit or a fresh air intake beside a dock or a truck bay draws in what the trucks give off.
  • Doors between office and floor. A door that stands open to the warehouse lets in heat, dust and fumes, and the office unit cools the warehouse. A dispatch office with a counter or hatch to the dock is an entrance zone of its own.
  • Product cooling is separate. In a packing shed, the staff room and office are a comfort job, and keeping the produce cool is refrigeration. See coolrooms.
  • A rural office. Dust loads the filters and the outdoor coil faster, so say what the site is like, what power it has, and where a unit can be reached for service.

How quiet does each room need to be?

AS/NZS 2107:2016 sets a recommended range of background sound level for each kind of room, open plan offices included, and design standards that follow it set quieter targets for enclosed rooms than for open floors. One university's design standard, which follows it, gives 30 to 40 dB(A) for meeting rooms, 35 to 40 for its staff offices and 40 to 45 for open plan areas (opens in a new tab), and notes that a hum, a rumble or a hiss annoys people more than steady broadband noise at the same level.

Quieter fans, and silencers in the ducts, are the usual ways to bring the noise down. Tell us which rooms need to be quiet, and where the outdoor units can go away from windows that open. The guide to air conditioning noise in a mixed use building covers noise reaching neighbours.

Collect the comfort complaints

Complaints are the best evidence an office has. Track them, to see whether there is a pattern or one spot. The problem is often humidity or air movement, not the temperature. For each complaint, note:

  • where the person sits, marked on a floor plan if you have one
  • whether they are too hot, too cold, in a draught or bothered by noise
  • the time of day and the time of year
  • whether it happens every day or only when a room is full
  • whether anyone uses a personal heater or fan nearby

A personal heater under a desk can make a nearby thermostat read the room as too warm and send more cold air, so heaters do not belong in an open office. In a meeting room with its own control, set it to suit most of the people in it.

Office assessment brief

Office air conditioning assessment brief

Fill in what you know, and leave the rest blank. Send it with an enquiry, or have it with you when you call.

Your answers stay on this open page. They are not saved or sent. Copy or print them before you leave.

The site

The spaces

There is a server or comms room

The building

Outside air comes in now through

Now

The air conditioning belongs to

What happens next

When we assess a site, we visit to look at the space, discuss your cooling needs, check the electrical capacity and work out where the indoor and outdoor units should go, taking in the sun, the layout and how the air moves. As at November 2026, ABL offers a free quote. Our commercial air conditioning page covers the systems we install and look after for businesses, and the guide to a commercial air conditioning site survey covers what to have ready for the visit.

Sources (17)

Planning an office?

Send ABL your office assessment brief with an enquiry, or call and talk it through.

Filled in the record? Copy or print it first: it is not sent with a call or an enquiry.