Planning air conditioning through a staged renovation or extension

Plan air conditioning through a staged renovation or extension: what the old system can do, whether to extend, add or replace, and a budget for each stage.

Last updated

Plan the air conditioning for the house you will end up with, then decide what each stage installs. The system you have was sized and laid out for the old house, so it may not have the capacity, the reach or the years left to serve the finished one. Draw the house now and as it will be, mark what the existing equipment can and cannot do, and choose for each new space whether to extend the old system, add a separate one, or replace it. Then work out what has to happen while the walls and ceilings are open.

How to use this guide

  1. Step 1: Draw both plans

    The rooms and their uses now, and when the work is finished.

    Go to Two plans
  2. Step 2: Choose for each space

    Extend, add or replace, and when each happens.

    Go to Extend, add or replace
  3. Step 3: Fill in the stage plan

    What each stage installs, moves or leaves for later.

    Go to the record

Start with two plans: the house now and the house finished

A sketch is enough. On the first, draw the house as it is: each room and what it is used for, and where the existing equipment sits. On the second, draw the finished house the same way. Then mark each construction stage on the second plan, with a rough date.

  • The equipment now: each indoor and outdoor unit, the ducts and outlets if it is ducted, the return grille, the controller and the switchboard.
  • The rooms that change: rooms that are added, joined, opened up, divided or given a new use, such as a garage becoming a living room.
  • What the work moves through: an outdoor unit where the extension will stand, pipes in a wall that is coming out, or ducts in a roof that is being raised or reframed.
  • How the rooms will be used: which rooms are used together, which are used at night, and which may stay closed.

Any change to the floor plan or the insulation changes how much heating and cooling the house needs. If you are planning an addition, it is worth having an accredited energy assessor model the whole home, so the windows and the building fabric of the new part are right before anything is sized. The guide to sizing a home air conditioner explains how each room's load is worked out.

What can the existing system still do?

Do not assume the old system will serve the finished house. Check each of these, and write the answer on the plan:

What limits an existing system, and what to find out
LimitWhat to find out
CapacityIt was sized for the old rooms. Added floor area, a bigger opening between rooms or a new west-facing wall all add load. Ask for a fresh load assessment of the finished house, not a guess from the old unit's size.
ReachA single split serves one room. A ducted system reaches only where its ducts and outlets go, and every room it serves needs a return air path. A multi-split can take more indoor units only if it has a spare port and the maker allows the combination.
Age and conditionHow old it is, its repair history, and whether parts are still available. A system near the end of its life is a poor thing to build a plan around. The guide to repair or replace sets out how to weigh it.
PositionWhether the outdoor unit, the pipes or the ducts are in the way of the building work. Moving a split system is a job for a licensed technician: see the guide to moving a split system.
PowerWhether the switchboard can take the extra load of the finished house, its new circuits and any new units. The guide to the electrical work in a quote covers it.

Extend, add or replace: what suits the new rooms?

For each new or changed space there are usually four ways to go. Which is better depends on the old system and on how the space will be used:

Ways to air condition new rooms, and when each is the better choice
ApproachWhat it involvesThe better choice when
Keep the old system and add a separate oneA split or a bulkhead unit for the new space, on its own outdoor unit and controller.The old system still suits the old part of the house, and the new space is used on its own, such as a bedroom wing, a studio or a converted garage.
Extend the existing ducted systemNew ducts and outlets from the existing unit into the new rooms.An assessment confirms the unit has the spare capacity and fan performance for the larger area. Without that, the same output is spread over more rooms.
A multi-split added to in stagesOne outdoor unit chosen for the finished number of rooms, with indoor units added as each stage is done.The rooms are separate and the stages are close together. The outdoor unit is chosen for the final combination from the start.
Replace with one system for the finished houseA new system designed for the final layout, installed when the work allows.The old system is old, undersized or in the way, and most of the house is changing.

On a multi-split, one outdoor unit usually connects two to five indoor units, and more on some larger systems, within a total capacity limit. Not every combination of indoor units is allowed, so the maker's combination table for the outdoor unit decides what can be added later. Choose the outdoor unit with the final rooms in mind, or it may not take the last stage.

The guide to choosing a room-control layout compares single splits, multi-splits and ducted in more detail, and the guide to a zoning plan for connected rooms and levels covers an addition on a second level. If ducts are already in the roof, see replacing ducts.

What about a loft or roof-space conversion?

A room in the roof sits directly under the roof, with no ceiling space above it to slow the heat, so it gains heat through the roof in summer and loses it in winter. Insulation, shading and sealing come first, because they decide how much the room needs. Then two things are different from an ordinary room:

  • The roof space is gone. A converted roof is often the space a ducted system would have used. If ducts serve the floor below, find out where they will go before the conversion is designed.
  • The walls are short and the ceiling slopes. A wall-mounted unit needs a wall high enough to take it and clear air in front, and the outdoor unit and pipes need a route down. A floor console or a slim unit in the low space behind a short wall may suit better.

A conversion is building work, and Consumer Affairs Victoria (opens in a new tab) says a registered building surveyor or your local council can advise whether a renovation or extension needs a building permit. For rooms with little space above or around them, see AC options when ceiling space is tight.

What has to happen while the walls are open?

Pipes, drains, power and access panels for later stages are simplest to run while the walls and ceilings are open. If a room will get its unit at a later stage, decide now whether to run its pipes, drain and circuit before the walls are lined, and record exactly where they go. The guide to air conditioning a new house before plastering has the checklist for that work, and it applies to an extension as well.

If the builder's contract covers the work, settle the air conditioning in it. Consumer Affairs Victoria (opens in a new tab) gives the supply and installation of air conditioning as an example of a provisional sum: an estimate the builder uses when a definite price cannot be given. A change after the contract is signed is a variation. Agree it with the builder in writing, with the price and the effect on the completion date, before the work starts. The legal process for varying a major domestic building contract is changing: Consumer Affairs Victoria (opens in a new tab) says new domestic building contract laws take effect by 1 December 2026 and bring in a single process for variations. Read its current page before you sign or vary a contract. That is as at November 2026.

Plan the comfort of the rooms you live in while the work goes on. Leave an air conditioner off in a room while it is being built in, painted or finished, and air the room well before you run it again: dust blocks the filters, and fumes from finishes can settle inside the unit. Check the manual for your model. Clean the filters more often while there is dust about. If a unit has to come off a wall for the work, ask whether it can be moved and refitted, or whether it is better replaced at the end.

How do you budget the stages?

Price the finished plan first, then split it into stages, so no stage spends money on something a later stage undoes. As at November 2026, ABL's published guide is $2,000 to $4,000 for a basic residential split system, installed, and from $7,000 to $15,000 or more for a ducted system, depending on the size of the home and the zoning. Your quote is the price.

  • Costs a plan avoids: running pipes later through finished walls, moving an outdoor unit twice, and buying equipment that the finished house outgrows.
  • Costs that move with the stages: a return visit for each stage, making good after each, and a temporary arrangement for rooms without heating or cooling.
  • Costs that are only worth paying once: a switchboard upgrade sized for the finished house, and a multi-split outdoor unit sized for the final rooms.

The Victorian Energy Upgrades (opens in a new tab) program offers discounts on efficient reverse cycle air conditioning through accredited providers, and says to contact one before you buy, because a discount is typically not applied afterwards. Ask about it before each stage, not after. The guide to rebates in an air conditioning quote has the questions to ask. That is as at November 2026.

Staged renovation air conditioning plan

Fill this in with your two sketches beside you, and send both with your enquiry. We install and replace split and ducted systems, and our air conditioning page explains how to ask for a quote. For an older house, the guide to air conditioning an older home covers the building fabric.

Staged renovation air conditioning plan

One line per stage is enough. Leave blank what is not decided yet, and list it at the end.

Your answers stay on this open page. They are not saved or sent. Copy or print them before you leave.

Now

Finished

Stages

Decisions

For the new rooms
Switchboard checked for the finished house
Air conditioning in the building contract

Other questions about air conditioning a renovation

Should I buy the new system now or at the end?

Buy what each stage needs, sized for the finished house. Rooms that will change a lot are usually best left until their stage is done, with pipes and power run while the walls are open. A unit bought too early may sit in a dusty building site or end up in the wrong place.

Can my existing ducted system just have more outlets added?

Only if an assessment shows the unit and its fan can carry the extra area. Adding outlets without spare capacity spreads the same heating and cooling across more rooms, so every room does worse.

Can a split system from the old part of the house be reused in the extension?

Sometimes, if it suits the new room's size and is in good condition. Moving it is refrigerant work for a licensed technician, and the move has its own costs. The guide to moving a split system covers when it is worth it.

Sources (14)

Renovating in stages?

Send your stage plan and sketches with an enquiry, or call ABL to talk through the stages. We look at the house before we quote.

Filled in the record? Copy or print it first: it is not sent with a call or an enquiry.